Yesterday on American Story with Joe Redhawk
Mesa Grande Band Turns On Solar Power and Prepares Its First New Homes in Two Decades
The San Diego County tribe is building 12 homes in its first phase, with plans for up to 150.
Filed November 10, 2026 · 📍 CA 92070
Were you there? Share your storyKey points
- Mesa Grande's first solar-and-battery project produces about 60 MWh a year
- Phase 1A brings 12 new homes, funded with $12.432 million in Tribal Homekey money
- The band plans up to 150 homes; they are its first new housing since the early 2000s
The Mesa Grande Band of Mission Indians in San Diego County has switched on its first solar-and-battery project and is getting ready to build its first new homes since the early 2000s [1].
The solar system is expected to produce about 60 megawatt-hours a year, with projected savings of more than $16,780, according to Tribal Business News [1].
On housing, Phase 1A will add 12 homes, funded with $12.432 million through California's Tribal Homekey program. The band's long-range plan calls for up to 150 homes [1].
Tribal Chairman Curtis La Chusa summed up what the work means for his people in four words: "We are still here" [1].
For families who have waited a generation for a new house on their own land, those 12 homes are more than a construction project. They are a homecoming.
Sources
- [1]Tribal Business NewsMesa Grande adds solar power, prepares first new housing in two decadesOpens in a new tab ↗
Which Native success story should American Story cover more?
- Tribal businesses
- Native veterans
- Tribal colleges
- Housing and family
Were you there?
If you were at the scene, or this story touched your life, tell us what you saw and what it was like.
Discussion 0
Sign in or create a free account to join the discussion.
No comments yet. Start the discussion.